We collect these details to refer your enquiry to a local bathroom renovations business. If you don't give them, we can't refer you. Your details may be stored by our hosting and service providers in Australia or overseas, including the United States. Our Privacy Policy explains how to access or correct your information and how to make a complaint.

What a full renovation means

A full renovation takes the room back to the frame and rebuilds it: old fittings and linings out, new plumbing and wiring, wall sheeting, a waterproof membrane, tiles, fixtures and a screen. It differs from a makeover because the wet areas are opened up, so any hidden damage is found. Ask each business to describe the scope in writing, room by room.

The order the trades arrive

A labour-marketplace guide gives a typical sequence: strip-out and rubbish removal first, then plumbing and electrical rough-in with carpentry repairs and new sheeting, then a screed with falls to the drain, waterproofing and curing, then tiling and grouting, and finally fit-off, painting and the screen. Ask your renovator for the same sequence with dates, so you can see where a delay would bite.

What the guide says about cost

The same guide gives about $15,000 to $45,000 for a standard bathroom, with a budget main bathroom at $15,000 to $25,000 and a mid-range family bathroom of six to eight square metres at $25,000 to $45,000. A premium or reconfigured room runs from $45,000 to $80,000 or more. It also gives a Brisbane budget range of $15,000 to $24,000, which is not an Ipswich price. Treat all of it as a rough check.

Line by line

The guide itemises a mid-range six square metre room: strip-out $1,800 to $3,000, plumbing $4,000 to $6,500, electrical $1,200 to $2,500, carpentry and sheeting $1,500 to $3,000, waterproofing $1,000 to $2,000, tiling labour $4,500 to $7,500, tiles $1,500 to $4,000, fixtures $4,500 to $10,000, screen $1,000 to $2,000 and painting $500 to $1,000. Margin comes on top, so ask each business to show its breakdown.

Timing

It says a standard bathroom takes three to five weeks on site when trades are booked back to back. A made-to-measure frameless screen is cut after the tiles go on, so the room may run with a curtain for a week or more before the glass arrives. Ask how the household will wash in the meantime.

What pushes a quote up

Moving the toilet or floor waste, a thick mortar bed under an older floor, rot behind the shower, large-format tiles, wall-hung fixtures, difficult access and a hot water upgrade all add cost, according to the guide. Ask the renovator which of those your bathroom involves, and what each would cost before the work starts.

Who must be licensed

The QBCC says a licence is required for building work valued over $3,300, and for plumbing and drainage whatever the value. Electricians are licensed through the Electrical Safety Office. The guide adds that waterproofing is a licensed trade of its own in Queensland. Ask for each licence details and look it up yourself.

Approvals

The QBCC says the owner is responsible for making sure the right approvals are in place. A certifier inspects at mandatory stages. Ask your renovator whether your job needs an approval, and get the answer in writing before the first day.

Older Ipswich homes

Wikipedia describes a city with a long history and more than 6,000 heritage-listed sites. If your house is old, tell each business the age before it quotes, because the floor, wall linings and any asbestos will shape the job. The Queensland Government has a page about asbestos at home.

Contracts and payments

Contract rules depend on the value of the work, and the QBCC publishes pages on each type. Read the one that fits your quote, and agree payments tied to finished stages. Keep every variation in writing.

Comparing quotes

Compare at least three on the same scope. If one is far lower, line it up against the breakdown above and find what is missing. Check that the plan names who does the waterproofing, which product is used and whether a certificate is supplied.

Getting started

Photograph the room from the doorway, the shower, the floor and the ceiling. Note the age of the house and any soft or stained areas, then send a request. Independent Ipswich renovators may contact you.

How long does a full bathroom renovation take?

One guide says three to five weeks on site for a standard bathroom when trades are booked back to back. Ask each renovator for dates.

What is the biggest single labour line?

The guide says tiling is usually the biggest labour line, at $4,500 to $7,500 for about 30 square metres of wall and floor.

Does a builder add a margin?

The guide says 15 to 25 percent on top of the trade costs. Ask what it covers.

Can I keep the layout and save money?

The guide says leaving the toilet, shower waste and vanity where they are is the biggest single saving, often $3,000 or more.

Get free quotes

Sources

We collect these details to refer your enquiry to a local bathroom renovations business. If you don't give them, we can't refer you. Your details may be stored by our hosting and service providers in Australia or overseas, including the United States. Our Privacy Policy explains how to access or correct your information and how to make a complaint.